Shiny Plaques and Empty Shacks: The Great PNM "Pappy-Show" of 2025

Look, if ribbon-cutting was an Olympic sport, Trinidad and Tobago would take gold every single time. Trini's like a fete too much in this country, but the PNM really took the cake before stepping out of office. They gave us wine, cheese, and red-carpet calypso to celebrate a new hospital and a shiny airport terminal, yet here we are in late 2026, and if you get sick or want to fly, you still out of luck.

Let's stop the mamaguy for a minute: you can’t heal sick people with a fancy speech, and you can’t fly an airplane through an empty concrete wall.

What the public actually witnessed back in March 2025 wasn’t the delivery of critical public goods. It was a massive, expensive victory lap for "practical completions" that left citizens holding the bag . Now that the tabanca has set in, the harsh reality is clear: neither facility is fully operational.

The PoSGH Central Block: Staged for the Cameras

The current administration has pulled back the curtain on the $1.3 billion Port of Spain General Hospital Central Block, and it has a real Rowley mamapoule look . Prime Minister Kamla Persad-Bissessar didn't hold back, calling the grand opening a straight-up charade and a "con job".

And she's not wrong. While the politicians were wining and dining, the building was still very much an active, dusty construction site . Worse yet, allegations have surfaced that medical equipment and furniture were literally shuffled between facilities and staged on a single floor just to look good for the cameras . It was all smoke and mirrors. Today, the Ministry of Health is still waiting on technical reports just to figure out when it will be safe to let a single real patient inside

ANR Robinson Airport: All Hype, No Flights

Over in Tobago, the state-of-the-art terminal was hyped as a massive "game-changer" for tourism . Yet, well over a year after its grand party, commercial passengers are still stuck using the cramped old setup.

The truth is, the terminal wasn’t even handed over to the Airport Authority until June 2026 . Now, millions more of tax dollars are being spent just to build basic arrival and departure lounges and fix customs and immigration bottlenecks . Chief Secretary Farley Augustine recently mentioned the space might finally open by October 2026 proving the PNM's lavish celebration was entirely premature.

The Financial Hangover: Wine and Cheese on Borrowed Time

But let’s look at the real kick in the teeth. It’s one thing to celebrate an empty shell; it’s another to use the last set of pennies in the national purse to fund the fete.

The PNM didn’t just open these incomplete sites, they threw lavish, red-carpet commissioning galas complete with top-tier catering, expensive sound systems, custom staging, and heavy security. While everyday citizens are fighting for basic medication at health centers and dealing with a brutal foreign exchange crisis, our leaders were popping corks and eating fine cheese.

And they did this while the country is technically bankrupt. T&T debt-to-GDP ratio has climbed into a dangerous zone , it's foreign exchange reserves are heavily propped up by borrowed money , and the government even had to roll out a desperate 0.25% Total Asset Tax just to squeeze extra revenue out of local financial institutions.

When a country is implementing emergency taxes to stay afloat, throwing a massive public fete for an airport that has zero commercial passengers is the definition of harden. They spent millions of taxpayers' dollars to buy themselves a pre-election PR campaign, leaving the state to scrape the bottom of the barrel just to pay the remaining contractor bills.

The Bottom Line: Propaganda Over People

There is a massive difference between finishing a concrete shell and actually running a public service. A hospital needs working doctors, sterile wards, and tested equipment. An airport needs customs officers, baggage scanners, and cleared flight paths.

The PNM didn't wait for functionality because functionality doesn't make for a good pre-election photo-op. By throwing massive celebrations for unfinished projects, the political directorate treats the tax-paying public like audience members in a theater of distraction.

Trinidad and Tobago needs fewer wine-and-cheese commissioning parties and more actual, functioning services. Until these buildings are treating patients and flying passengers, those shiny commemorative plaques are just expensive tombstones for public accountability.

Sarge

Thu, Sep 17, '26 at 1:14 PM

PM: Govt working to get PoSGH Central Block operational

Persad-Bissessar also criticized the former People's National Movement administration over the state of the project. She recalled that the previous government held a sod-turning ceremony for the $1.3 billion facility on November 19, 2019, and later staged what she described as a "practical completion ceremony" on March 10, 2025.

"At that time, the facility was still a major construction site and very, very far from completion," she said.

Persad-Bissessar accused the PNM of moving medical equipment and furniture between facilities to create the impression the Central Block was ready for service.

"They moved equipment, furniture and so on from one facility to another so they could outfit one floor at that Central Block to give the impression the facility was completed and about to be operationalized. It was a con job on the people," she claimed.

Thu, Sep 17, '26 at 1:21 PM

Farley: New Tobago airport terminal to open before October

Dr. Keith Rowley officially hosted a ceremony for the "practical opening" and completion of the new terminal on March 15, 2025.He unveiled a commemorative plaque and led a tour of the facility, marking one of his final highly-publicized duties before his transition from office The “practical opening” of the airport terminal was the final act of then prime minister Dr Keith Rowley.

Augustine said the terminal’s build-out has entered its second phase, but the ongoing works will not affect the opening date. “We have completed the first phase of works on the inside of the terminal and we are starting the second phase. Those works can actually happen while the terminal is operational, so I believe we have everything we need now to go operational,” he said. He added that Tobagonians would be proud of the new facility, which is expected to showcase the island’s culture and history.

The new terminal at the ANR Robinson International Airport in Tobago is expected to open before October. Speaking to the media on Wednesday, Tobago House of Assembly (THA) Chief Secretary Farley Augustine assured the public that the new facility will be ready to accommodate the influx of visitors expected for the island’s annual Carnival celebrations, scheduled for October 30 to November 1